Build budget calculator

Most build budgets go wrong the same way: someone multiplies a floor area by a per-square-metre rate and calls it the cost. That rate covers the building and nothing else. This adds the lines it leaves out.

Last checked .

Building work$654,000

200m² × $3,270/m² — the Q1 2026 average for Auckland, from consent data. This is the only line we fill in for you, because it is the only one we have a sourced figure for.

Everything else

These start at zero on purpose. They vary too much by council and by section for a national average to mean anything, so we would rather you put in a real quote than trust a number we made up.

Where does the building rate in this calculator come from?

It is $3,229 per square metre: the average value owners put on the building work when they applied for consent in Q1 2026, divided by the floor area. It excludes land, and it averages everything from a modest townhouse to an architectural one-off — a starting point, not a quote for your house.

Source: Stats NZ building consent data, analysed by interest.co.nz · the tables · checked 2026-09-16. Cost by region →